Lizcano Consulting Engineering INC.

The professional's choice

HOME

PRINCIPAL

SERVICES

PROJECTS

LINKS

 

Representative Projects


SAN FERNANDO CATHEDRAL           1975,   1976,   1988,   1998,   1999    2000
San Antonio, Texas

Scope:    Manuel F. Lizcano was the mechanical -electrical engineer for the Restoration & Renovation of the 19th Century Nave in 1975, the Restoration and Renovation of the 18th Century Sanctuary in 1976, the and the Priest Quarters in 1976 with Ford, Powell and Carson Architects.  The Addition to the San Fernando Rectory with Morkovsky + Associates in 1988 and again with Ford Powell and Carson in 1998 in a systems assessment report. In 1999 we are the ME team member for Rafferty Rafferty Tollefson Architects, Fisher Heck Architects and Sprinkle Robey Architects in a Master Plan Project for San Fernando Cathedral Historic Restoration & Expansion. This master plan The Cathedral Historic Restoration, The Cathedral Centre and the Cathedral Community Centre. Construction Documents for the Cathedral Historic Restoration, and The Cathedral Centre were prepared by Rafferty Rafferty Tollefson Architects and  Fisher Heck Architects with Lizcano Consulting Engineers as Mechanical – Electrical Consultants.

CONSERVATION ENVIRONMENT PROJECT (Phase I)

McNay Art Museum
San Antonio, Texas
Project Cost: $2,500,000
Scope: Construction of Central Chilled and Hot Water Plant. Distribution system for 7 building systems (40,000 sq. ft.) including replacement of existing units. Equipment and controls to maintain temperature and humidity, new humidification system, new gaseous and particulate filtration, DDC controls Fire Protection and new lighting system for the Main House


 

MASTER PLAN FOR MECHANICAL AND ELECTRICAL SYSTEMS McNay Art Museum

San Antonio, Texas
Project Cost: $5, 033,000 estimated probable cost)
Scope: Research, investigations, evaluation and development of options for the recommendation of a consistent, stable and quality environmental control system for the McNay Art Museum.  Evaluation of options for Central Plant and development of schematic design to develop accurate construction estimates.  82,000sq.ft with expansion to 150,000 sq.ft


 

McNay ART INSTITUTE: FROST GALLERIES

SAN ANTONIO, TEXAS
Project Cost:  $233,000
Scope: Galleries
Services provided: Plumbing, HVAC & Electrical


 

PALACE THEATER 

Canadian, Texas
Scope: Restoration of 1950’s movie theater.
WEBB COUNTY COURTHOUSE
Laredo,
Texas
Scope: Adaptive reuse.


 

SOUTHSIDE INDEPENDENT SCHOOL DISTRICT

San Antonio, Texas
Project Cost: Estimated:  $13,000,000
Scope: 286,540 sq.ft.-two story Pre-cast wall construction Administration, classrooms, science labs, trades, cafetorium competition gym and girl's gym.
Services Provided: ACHV and Electrical


 

McNay Art Museum

San Antonio, Texas
Scope: Various service provide for the
McNay Art Museum through the years include:
The Stieren Addition, The Tobin Library, The Frost Galleries, Lawson Addition, and various minor projects such as water pump for the water tower and the pumping system for the main decorative fountain.

 

CONTINUING EDUCATION CENTER

Trinity University
San Antonio, Texas
Project Cost:  $535,000
Scope: Adaptive re-use of historical structure Offices and classrooms
Services Provided: Plumbing, ACHV & Electrical


 

SHAVANO PARK CITY HALL AND POLICE BUILDING

City of Shavano Park
Shavano Park
, Texas

Project Cost: $1,400,000
Scope: HVAC, Plumbing, Lighting and Power design and construction documents.  Design includes multiple DX rooftop units, and backup power generation for police station.  The 11,000SF facility includes three (3) inmate cells designed to State of
Texas Jail Standards.


 

HENRY A. GURREA, JR BRANCH LIBRARY

San Antonio Public Library
San Antonio, Texas
Project Cost: $1,768,000
Scope: 18,000 Square Foot library Buildings.  Split System DX/hot water heating system, for library, offices, and conference rooms.
Services Provided: Construction Documents and construction Administration for mechanical and electrical work.


 

HARRIS MIDDLE SCHOOL

San Antonio Independent School District
Project Cost: $578,808.00
Scope: 72,000 Square Feet including portable Buildings. Retro Fit chilled/hot water 260 ton central plant, air conditioning system, new primary electrical and conversion to 480/277-208/120 Volt system.
Services Provided: Construction Documents and construction Administration for mechanical and electrical work.

 

SOUTHSIDE INDEPENDENT SCHOOL DISTRICT

San Antonio, Texas
Project Cost: Estimated:  $13,000,000
Scope: 286,540 sq.ft.-two story Pre-cast wall construction Administration, classrooms, science labs, trades, cafetorium competition gym and girl's gym.
Services Provided: ACHV and Electrical


 

SAMSCO BUILDING

San Antonio, Texas
Project Cost: $ 3,033,000
Scope: Renovation Project:  Plumbing, Air Conditioning, Heating and Ventilation, for 115,000 sq. ft. of offices for state agencies.


 

FLOW EQUALIZATION FACILITIES

Dos Rios/Leon/Salado Wastewater Treatment Plants
City of San Antonio

Project Cost: $800,000 (Electrical Construction Only)
Scope: One 30 and two 12 million gallon facilities consisting of diversion structures, diversion pump station, bar screens, pre-aeration basins, parshall fumes, second  diversion structures, return pump stations and  equalization basins.
Services Provided: Design of all electrical and instrumentation systems.


 

DIGESTER REHABILITATION

Leon Creek & Salado Creek Wastewater Treatment Plants
City of San Antonio

Scope: New sludge lines and automatic valves for each digester, replacement of heaters with larger boilers, addition of water heating systems, addition of mixers,  addition of waste gas burners, construction of motor  control building, installation of new electrical work, and installation of related piping, mechanical and instrumentation work.
Services Provided: Construction Observation for electrical and instrumentation work.


 

FIRE STATION NO. 15

City of San Antonio
Project Cost: $644,000
Scope: 3800 square feet; four pump truck station; 15 ton AC system.
Services Provided: Construction Documents and construction Administration for mechanical and electrical work.


 

LAREDO JOB CORPS CENTER

U. S. Department of Labor Employment and Training Administration
Services Provided: Site survey of mechanical and electrical systems.  Construction Documents of Mechanical & Electrical work


 

CAPEHART HOUSING UNITS

Replace HVAC Systems for 123 Existing Units
Lackland AFB: (Department of the Army Corps of Engineers)
Project Cost: $780,000
Services Provided:  Construction Documents for mechanical and electrical work


 

LOADING DOCK, ADDITION

Building 360
Kelly AFB: (
San Antonio
Real P-Property Maintenance Association)
Services Provided: Construction Documents for extension of chilled and hot water systems, plumbing fire protection sprinkler system and electrical system.


 

FAMILY SERVICE CENTER

Naval Air Station
Kinqsville, Texas
Services Provided: Construction Documents for Air Conditioning, Heating Ventilation Plumbing, Lighting and Power for new facility

 

SOUTHWEST RESEARCH LAB

Alterations to Fuel & Lubrications Lab
San Antonio, Texas
Southwest Research Laboratory
(Department of the army, Forth Worth District Corps of Engineers)
Services Provided: Replace and upgrade engine exhaust system, Replace existing HVAC: system.

 

FOX PHOTO PLANT

Dallas, Texas
Project Cost: Estimated:  $795,000
Scope: 16,500 sq.ft.-two story existing building Photo processing plant, administration, receiving, dark rooms, films processing, cut & sort chemical storage.
Services Provide: Preliminary Scheme: All new systems: New systems supplemental with existing system: existing system supplemented new systems. Final design of selected schemes Plumbing. ACHV & Electrical

 

U.S. ARMY RESEARCH LABORATORY

South West Research Center

San Antonio, Texas

Project Cost: $204,300


 

PARKING STRUCTURE: INTERNATIONAL AIRPORT

San Antonio, Texas

Project Cost: $7,500,000

Scope: Fire Protection, domestic water, heating & ventilation systems for 500,000 sq. ft., 3 level garage with 1300 car capacity.
 

BEXAR COUNTY ADMINISTRATION BUILDING

Bexar County, Texas

Project Cost: $7,200,000

Scope: Plumbing, Fire Protection, Air Conditioning, Heating, Ventilation, and Electrical for 100,000 sq. ft. of office structure and 180,000 sq. ft. of parking structure.


 

MIDLAND EXHIBITION HALL

Midland, Texas

Project Cost: $317,000

Scope: Pluming, Sprinkler, Air Conditioning, Heating, Ventilation, and Electrical for 12,600 sq. ft. of multi-purpose facility.


 

THE BLUM BUILDING

Galveston, Texas

Project Cost: $600,000

Scope: 30,000 sq ft. three story 19th Century iron clad structure. Adaptive reuse: Victorian-style restaurant on first level and offices on upper levels.

Services provided: Plumbing, HVAC: & Electrical


 

THE SELWYN LIBRARY, MUSIC, DRAMA BUILDINGS

Denton, Texas

Project Cost:$450,000

Scope: 17,300 sq. ft.

Services provided: Plumbing, HVAC and Electrical complete through construction documents rents


 

URSULINE ACADEMY

San Antonio, Texas

Adaptive reuse by Southwest Craft center

Project Cost: $400,000

Scope: Project One: Basement of existing dormitory - adaptive reuse

Project Two: Chapel - adaptive reuse - conversion to assembly area and meeting rooms while maintaining historical integrity

Services provided: Plumbing, HVAC & Electrical


 

WILLLAM WALDO CAMERON

Waco, Texas

Project Cost: $300,000

Scope: Three-level Mediterranean style mansion renovated as the home of the Waco Creative Art Center

Services provided: Plumbing, HVAC & Electrical


 

DATAPOINT BUILDING, NO. 4

San Antonio, Texas

Project Cost: $1,452,000

Scope: 144,800 sq. ft. electronic assembly area and paint spray booths

Services provided: Plumbing, HVAC & Electrical
 

UNIVERSITY OF DALLAS:  UNIVERSITY CENTER

Irving, Texas

Project Cost: $1 516,000

Scope: New 3 story addition - 30,200 sq. ft.: Dining, kitchen, rathskeller, dining and kitchen gallery, party rooms, -and kitchen, maintenance and operation dock. Remodel existing 2 stories - 19,000 sq. ft.: Recreation, bookstore, post office, gallery, deans offices, managers apt. student publications office, meeting room, clinic.

Services provided: Plumbing, HVAC & electrical


 

LA QUINTA MOTOR INN

Lubbock, Texas

Project Cost: $657,280

Scope: 104 unit 2 story motel; laundry with 3 commercial washers and dryers; heated pool.

Services provided: Plumbing, HVAC: & Electrical


 

STORE & WAREHOUSE BUILDINGS A.C. TOUDOUZE

San Antonio, Texas

Project Cost: $90,000

Scope: 48,000 sq.ft. Warehouse; 2 story store area; 1st floor 32,000 sq. ft. sales area and customer office and T/R; 2nd floor 26.800 sq. ft. sales area and an administration offices, T/R and lunch room.

Services provided: Plumbing, HVAC & Electrical


 

PARK TEN OFFICE GARDEN COMPLEX

San Antonio, Texas

Project Cost: $2,100,000

Scope: Six - 2 story office buildings on landscape site 2 - 33,180 sq. ft. buildings (a) 120T each 282 KW. 2 - 18,540 sq. ft. buildings (b) 80T each 213 KW ea.
 

WATERGATE APARTMENTS

Little Rock. Arkansas

Project Cost: $1,900,000

Scope: 19 buildings:  5-4 apt. buildings; 12-8 apt. buildings; 2-12 apt. buildings; total of 140 apartments. Club; Managers office, club area, maintenance and laundry. Pool: Heated pool adjacent to club.

Services provided: Plumbing, HVAC & Electrical


 

J.C. PENNY'S STORE NO. 1339

Joplin, Missouri

Project Cost: $ 2,000,000

Scope: Main store: 1st floor - sales areas, display windows, stock areas, toilet roans, dressing rooms, beauty salon, total area 1st floor, 61,400 sq. ft. 2nd floor - office area, work and stock area; 20,160 sq. ft. Mechanical room:  4,600 sq.ft. Future sales area:  36,640 sq. ft. tba store: (tires, batteries and accessories) - sales, office and lunch and T/R area - 3800 sq. ft. Service (12 overhead doors) - 4400 sq. ft. Storage area - (2 levels at 1660 sq. ft.) 3300 sq. ft. Total area = 11,500 sq. ft.

Services provided: Plumbing & HVAC, Electrical distribution and electrical specifications.


 

KLEBERG BANK & OFFICE BUILDING

Kingsville, Texas

Project Cost: $1,400,000

Scope:  3 story office building with basement - total 52,00 sq. ft.

Basement:  mechanical roan, lunch roan, T/R, lease area.

1st floor:  Bank, lobby with high bay, offices

2nd and 3rd floor: Offices, T/Rs

Services provided: Plumbing & HVAC


 

KLEBERG BANK & OFFICE BUILDING

Kingsville, Texas

Project Cost: $1,400,000

Scope:  3 story office building with basement - total 52,00 sq. ft.

Basement:  mechanical roan, lunch roan, T/R, lease area.

1st floor:  Bank, lobby with high bay, offices

2nd and 3rd floor: Offices, T/Rs

Services provided: Plumbing & HVAC


 

LIBRARY & FINE ARTS BUILDING: SOUTH WEST TEXAS JUNIOR COLLEGE

Uvalde, Texas

Project Cost: $99,000

Scope: Library: 21,600 sq. ft. 2 story building. Fine A-Arts: 14,100 sq. ft.

Services provided: Plumbing


 

MEN’S DORMITORY:  SOUTH WEST TEXAS STATE UNIVERSITY, PHASE III

SAN MARCOS, TEXAS

Project Cost: $3,315,000

Scope: 12 story dormitory for 450 occupants with dining and laundry facilities

Services provided: Plumbing


 

SCHOLASTICATE BUILDING:  ST. MARY'S UNIVERSITY

San Antonio, Texas

Project Cost: $2,100,000

Scope: Dormitory rooms, commercial kitchen, dining area, commercial laundry facility, auditorium, classrooms, work shops (welding, auto, mech., etc.)

Services provided: Plumbing and complete charge of construction phase.


 

SAN ANTONIO SAVINGS & LOAN ASSOCIATION

San Antonio, Texas

Project Cost: $2,000,000

Scope: 13 story office building

Services provided: Drafting and minor design of Plumbing & HVAC systems.


 

BEXAR COUNTY COURTS BUILDING

San Antonio, Texas

Project Cost:  $12,000,000 (estimated)

Scope: 13 story structure and basement concourse (future adjacent 13 story tower). Basement: sheriff's offices, mechanical equipment ~d First floor: Meeting rooms. 2nd floor: Offices of criminal District Atty., audit probation offices. 3rd floor: Central filing, -mental health offices. 4th floor: J.P. Courts; constables; district courts. 5th thru 13th floors: 28 court rooms; future courts

Services provided: HVAC preliminary design


 

NAVAL AIR STATION

Corpus Christi, Texas

Project Cost: $786,000

Scope: Control tower: 5 story structure surmounted by octagonal control cab. 2532 sq. ft. communication equipment floor, and back-up equipment floors, mechanical equipment floor, elevator equipment floor. RATCC Building: 1 story structure, 6600 sq. ft. - operations roan, communications equipment room, offices, training room, men and women locker and T/R, telephone roan, recorder, Mechanical, roan, generator roam.

Services provided: Plumbing and HVAC


 

OFFICERS QUARTERS:  BROOKS AIR FORCE BASE

San Antonio, Texas

Project Cost: $600,000

Scope: Building A - 7060 sq. ft. ea. of two floors, Building B - 6728 sq. ft. ea. of two floors

Building C - 6728 sq. ft. ea. of two floors

Services provided: HVAC: and primary electrical distribution


 

AMERICAN NURSING & CONVALESCING HOME

San Antonio, Texas

Project Cost:  $886,150

Scope: 2 level center for 100 patients: lower level - 18,800

Sq. ft., upper level - 26,000 sq. ft. administration, central

nurses station, personal dining, dining and assembly, library,

TV and conversation, commercial kitchen, mechanical roan, men

and women’s lockers, commercial laundry, therapy clinic, toilet

-rooms. Each of four wings consists of private, double and qua-

duplex units with a nurses station, tub and shower area.

Services provided: Plumbing and HVAC and complete charge of construction phase.


 

ELECTRONIC OVERHAUL DEPOT: 

KELLY AFB, BUILDING

308 San Antonio, Texas

Project Cost: $350,000

Scope: Standard clean room, controlled area room, air locks, parts clean room, & offices: 19,775 sq. ft.

Services provided: Drafting of ductwork, piping diagram, schedules and plumbing systems. Design of plumbing systems. Sizing of air distribution system.